A Mississippi facility will produce transformers in the 10 MVA to 160 MVA range, designed for voltages up to 230 kV. The additional capacity “is expected to help alleviate industry-wide supply constraints,”…
20 comments
https://en.wikipedia.org/wiki/Solid-state_electronics
Also regarding child comment, how did we already get to slurs for those with developmental disabilities? Can we avoid those, please?
IIUC the real bottleneck is in transmission (>50kv) not distribution transformers.
“Lead times, or the time taken between an initial order and its delivery, for some high-voltage transformers have increased to multiple years from around a year in 2020 and 2021’ [1].
[1] https://www.reuters.com/business/energy/us-power-companies-s...
Read the full thread on Hacker News →
Related stories
- Lobsters · 34 points · almost 7 years ago
- Don't test in production? Test in productionopensource.comLobsters · 6 points · over 7 years ago
- The saga of the Power ISA 128-bit long doubletalospace.comLobsters · 16 points · almost 8 years ago
- Ars Technica · 0 points · 14 days ago
- Hacker News · 1 points · 5 days ago
- Hacker News · 1 points · 2 days ago